---
title: Build Table view
slug: build-table-view
docTags: 
createdAt: 2026-05-28T13:01:36.106Z
---

When you click the Technical Service View Details from the Table View, a new dialog appears with the service details. The following elements are displayed in this dialog:

- The **Build Details** plus the name of the technical services in question.
- Two tabs that display different build information: **Details** and **Analysis history**.
- The next item in the technical services details view is a time frame with the following selections:
  - **1D**: 1 Day, last 24 hours
  - **7D**: Last 7 Days
  - **14D**: Last 14 Days
  - **2M**: Last 2 Months
  - **3M**: Last 3 Months
  - **6M**: Last 6 Months
  - **Custom duration**: A custom date range within 6 months

# Details tab

The Details tab presents two graphs: **Build status** and **Build duration**.

# Build status

The Build Status represents the status of total build requests for the selected period. The Build Status data is presented in a bar graph governed by two axes. The **Passed** Builds are represented in green color, and the **Failed** Builds are represented in red color.

The Build Status bar graph presents two axes, described as follows:

- **X-Axis**: The X-axis corresponds to the timeframe in which builds took place. By hovering over the graph, the following data is presented:
  - **Duration:** The cut-out date for quantified builds.
  - **Total Builds:** The total number of builds for the timeframe.
  - **Group:** Either Passed or Failed builds.
- **Y-Axis&#x20;**: The Y-axis corresponds to the total number of Builds in the selected timeframe.

By placing the cursor right above a bar, in alignment with the center of it, the following information is displayed:

- **Duration:** The cut-out date for quantified builds.
- **Total builds:** Total number of builds for a specific category (Passed or Failed).
- **Group:** Either Passed or Failed builds.

:::hint{type="info"}
This graph allows you to click on either one of the **Passed** or **Failed** check boxes at the bottom only display data for a specific build status.
:::

# Build duration

Build Duration represents the total duration of builds for the selected period. The Build Duration data is presented in a bar graph governed by two axes.

The Build Duration bar graph presents two axes, described as follows:

- **X-Axis (Duration):** The X-axis corresponds to the timeframe in which builds took place. By hovering over the graph, the following data is presented:
  - **Duration:** The cut-out date for quantified builds.
  - **Execution Duration:** Duration of execution measured in seconds.
  - **Group:** Passed category of Builds.

:::hint{type="info"}
The **Build Duration** graph only presents data for the Passed builds.
:::

- **Y-Axis (Execution Duration (Average in seconds):** The Y-axis corresponds to the Execution duration measured in seconds.

# Analysis history

The **Analysis history** tab presents a table that provides **Build Executions** data in a tabular form and enables a detailed view of each Build. Each row in the table displays information for Builds, separated by columns of information type:

- **Build id:** The ID associated with the Build.
- **Status:** The build status (Passed or Failed).
- **Duration:** The build duration is measured in seconds.
- **Build engine:** The Build tool source.
- **Build at:** The date and time when the build took place.
- **Build URL:** URL generated by the Build engine.

:::hint{type="info"}
Only the Build at column can be sorted, and above this table, you will find a **Settings** icon that allows changing the table settings to show or hide pre-selected columns.
:::

